Paviath Integrated Solution Paviath

PROJECT CIVIL » BRIDGE ENGINEERING » Bridges PK19 and PK47

Bridges PK19 and PK47 + 58 + 22

Bridges are not cutting the composite beam structure having a span of 33m. Bridges are designed for four lanes.

 
Bridges PK19 and PK47 + 58 + 22
 
modeling of bridge
 
modeling of bridge
 
The calculation results
 
The calculation results
 
The calculation results
 
 
 
 
 
 
info@paviathintegratedsolution.com www.paviathintegratedsolution.com