The building of the palace fight them. Ivan Yarygin

The construction site of the building: Moscow, Aviamotor Street, Building 40..

Load-bearing roof structure - farm F1, F2, F3. Farm F-1 27 m span consists of three mounting marks. Farm P-2 a span of 15 m is divided into two mounting marks. Step Runs - 3 m. By purlin insulating panels stacked «ISORA» 175 mm, the snow load sensing.

General view of the building (top view)
General view of the construction

simulation design

General view of the calculation model of the building
A general view of the calculation model of a building (not shown conditionally coating)

The calculation results

According to the calculation of the end of the following results were obtained:

A general view of the calculation model of a building (not shown conditionally coating)
total displacement distribution map
Map deformations farms bottom chord
The first form of construction buckling

Summarizing the results, we can conclude that the design of the building is capable of carrying the load applied to it, corresponding to the construction area, and does not require additional measures to increase the strength characteristics.