The building of the palace fight them. Ivan Yarygin
The construction site of the building: Moscow, Aviamotor Street, Building 40..
Load-bearing roof structure - farm F1, F2, F3. Farm F-1 27 m span consists of three mounting marks. Farm P-2 a span of 15 m is divided into two mounting marks. Step Runs - 3 m. By purlin insulating panels stacked «ISORA» 175 mm, the snow load sensing.


simulation design


The calculation results
According to the calculation of the end of the following results were obtained:




Summarizing the results, we can conclude that the design of the building is capable of carrying the load applied to it, corresponding to the construction area, and does not require additional measures to increase the strength characteristics. |