PAVIATH INTEGRATED SOLUTION
PAVIATH INTEGRATED SOLUTION
Paviath

Bridges PK19 and PK47 + 58 + 22

Bridges are not cutting the composite beam structure having a span of 33m. Bridges are designed for four lanes.

Bridges PK19 and PK47 + 58 + 22
modeling of bridge
modeling of bridge
The calculation results
The calculation results
The calculation results
info@paviathintegratedsolution.com www.paviathintegratedsolution.com