Building high school sports department of physical culture and sport "Olympian"
Place of construction: Ul. Udaltsova
design building consists of two parts, the building framework is a set of trusses, which are interconnected via a system runs. Bearing truss is pivotally mounted to the support columns.


simulation design




The calculation results
According to the calculation of the end of the following results were obtained:






Summarizing the results, we can conclude that the design of the building is capable of carrying the load applied to it, corresponding to the construction area, and does not require additional measures to increase the strength characteristics. |