Educational and Sports Recreation Complex.
Place of construction: Ul. small Filevskaya
Constructions universal halls and health center are a set of trusses, which are interconnected via a system runs. Bearing truss is pivotally mounted to the support columns.
Constructions propeller hall are a set of beam overlap, interconnected via a system runs. The carrier beam is pivotally fastened to the vertical support columns.


simulation design




results
According to the calculation of the end of the following results were obtained:






Summarizing the results, we can conclude that the design of the building is capable of carrying the load applied to it, corresponding to the construction area, and does not require additional measures to increase the strength characteristics. |